Fully equipping the water station with solar panels including mounting structures and installation, electrical cables, control panels, and all necessary connections for the station’s operation, along with conducting comprehensive testing to ensure the full operational safety and integrity of the system.
Client: Shafak Organization
Location: Jabin/Hama
Category: Syria
0 comments
Write a comment