DESCRIPTION:

Implementation of a sewage network with pipes of 20 cm – 50 cm – 80 cm diameter with an estimated total length of 1500 meters, including topographical works with excavation and spreading a layer of sand around the pipe with a thickness of 15 cm, with backfilling, asphalt and leveling works, inspection pits, rain drains of reinforced concrete, and gypsum covers.

Client: Bahar organization

Location: afrin - Al-Siyasiah street and Al-ittihad school

Category: Syria