DESCRIPTION:
Implementation of a sewage network with pipes of 30 cm – 40 cm – 50 cm diameter with an estimated total length of 3400 meters, including topographic works with excavation and spreading a layer of sand around the pipe with a thickness of 15 cm, with backfilling, asphalt and leveling works, inspection pits, rain drains of reinforced concrete, and gypsum covers.
Client: Orange Organization
Location: Harem - Taftanaz - Shalkh - Maarat Misrin
Category: Syria