DESCRIPTION:
Implementation of a sewage network with pipes of 20 cm – 50 cm diameter with an estimated total length of 2000 meters, including topographical works with digging and spreading a layer of sand around the pipe with a thickness of 10 cm, with backfilling, asphalt and leveling works, inspection pits, rain drains of reinforced concrete, and gypsum covers of concrete, in addition to equipping and installing a complete water station, including all digging and construction works and equipping the well.
Client: Qater charity Organization
Location: Aleppo / Bilal Mosque
Category: Syria