Maintenance of the sewage network in Al-Haramain camp

  • Maintenance of the sewage network in Al-Haramain camp
  • Maintenance of the sewage network in Al-Haramain camp
  • Maintenance of the sewage network in Al-Haramain camp
  • Maintenance of the sewage network in Al-Haramain camp
  • Maintenance of the sewage network in Al-Haramain camp
  • Maintenance of the sewage network in Al-Haramain camp
  • Maintenance of the sewage network in Al-Haramain camp
  • Maintenance of the sewage network in Al-Haramain camp
  • Maintenance of the sewage network in Al-Haramain camp

DESCRIPTION:

Rehabilitation of a sewage network with an estimated total length of 1000 meters, including topographic works with excavation, cleaning, spreading a layer of sand, asphalt and leveling works, inspection pits, reinforced concrete rain drains, concrete manhole covers, and removing interlocking tiles in some places and reinstalling them.

Client: Solidarites International Organization

Location: Aleppo - Azaz - Al-Haramain Camp

Category: Syria